2011 Tour of Homes concludes this weekend and it has been a huge success judging by the crowds coming to view Meritage.
- 10 months ago
Andrew, the electrician wishes he was a little taller to install the lights high in the great room ceiling
- 10 months ago
The tile setters and the plumbers have almost finished the master bedroom shower and bathtub area
- 10 months ago
Architectural Millwork provided these custom 7-1/4” tall knotty alder baseboards with black walnut inlay for the loft
- 10 months ago
The landscapers have graded, brought in soil, installed irrigation and started the plantings around the property.
- 10 months ago
The dining room is almost finished with the addition of the lights, chair rail and coffered ceiling.
- 10 months ago
A cable railing system has been chosen to surround the nook patio deck to preserve the view.
- 10 months ago
The laundry room is taking shape. The floor has been laid, the cabinets installed, stained and sealed, the granite slab and the back splash have been placed.
- 11 months ago
The front concrete steps have been completed. Lamp posts and railings will be added next.
- 11 months ago