For more photos of the finished product, go to

http://dcdesign.com/galleries/Meritage/

  • 9 months ago

2011 Tour of Homes concludes this weekend and it has been a huge success judging by the crowds coming to view Meritage.

  • 10 months ago

Andrew, the electrician wishes he was a little taller to install the lights high in the great room ceiling

  • 10 months ago

The tile setters and the plumbers have almost finished the master bedroom shower and bathtub area

  • 10 months ago

Architectural Millwork provided these custom 7-1/4” tall knotty alder baseboards with black walnut inlay for the loft

  • 10 months ago

The landscapers have graded, brought in soil, installed irrigation and started the plantings around the property.

  • 10 months ago

A copper rain chain has been installed by the entry to add interest.

  • 10 months ago

The dining room is almost finished with the addition of the lights, chair rail and coffered ceiling.

  • 10 months ago

A cable railing system has been chosen to surround the nook patio deck to preserve the view.

  • 10 months ago

It didn’t take long to lay the carpet in the bedrooms and the bridge.

  • 11 months ago

The laundry room is taking shape.  The floor has been laid, the cabinets installed, stained and sealed, the granite slab and the back splash have been placed.

  • 11 months ago

The last of the parquet floors are being laid on the steps into the theater room

  • 11 months ago

The front concrete steps have been completed.  Lamp posts and railings will be added next.

  • 11 months ago

The stone slabs have arrived!!

  • 11 months ago

The concrete workers have been working hard this past week.  Here the main driveway has been installed.

  • 11 months ago